Goldenhide Enterprises, Inc.

Leather goods production & inventory

Log In
Create Account
Sign in with the account created by your company Admin or Programmer / System Developer.
Goldenhide Enterprises, Inc.
Connecting…

Dashboard

Inventory and production overview.

Inventory Dashboard

Every item in stock: the Material Inventory's and the Accessories page's own, each with what is on hand now. An item's name opens its ledger.

My Queue

Tasks waiting on your role.

Budget & Deadline

Production budgets and schedules for your Job Orders.

Leather Ledger

Leather released to the floor, used, returned and scrapped — per job order, against its Material Summary budget.

Leather Balance

Movements

QC Log

Quality checks at each stage: how many pieces were checked, passed and failed, and why.

Per Job Order

Checks

Transmittal Logbook

Written before Finishing: what was cut (QTY CUT), what came in (QTY IN, which has to tally with it), how that was divided among the stores, and what is still in storage. The dividing is done on Ready to Deliver.

Records

Bodega Cut Leather Logbook

Output Report

Leather Preparation Report

Cut leather received from the cutter, part by part and colour by colour: what was prepared, what was rejected, and what the bodegera received.

Received Prepared Leather Ledger

Prepared leather taken in by the bodega: what was counted on receiving, what was released to areglo, and what is still being held.

Production Budget

Choose which budget you are working on.

Ready to Deliver

What the Transmittal Logbook has transmitted and the stores have not taken yet. Each line is divided among the stores here: the date, the quantity and the D.R. number under each store.

Purchase Orders (P.O.)

Leather, accessories and materials on order: prepare the P.O., verify and print it, follow it from ordered to shipped, and receive the delivery into stock.

Budget Summary

The labor budget of a job: work it out from a unit budget and a quantity, keep it — against its job order when it has one — and see it beside the labor actually logged.

Cost of Goods (COG)

What each job order cost — leather, materials, lining and labor — on the COG sheet as it is kept in Excel, and the price lists of the COG table file: product costs, selling prices and corporate prices.

Completed Job Orders

Job orders that went through every stage and were closed. Open one to read its record, or start a new job order from the same Line Plan style.

Job Order Board

Job order quantities, store transmittals and production progress.

Job Order Register

Excel column order. Open a JO to view its details, or expand Transmittals for store delivery records.

Accessories & Inventory

Inventory, releases, purchases and consumption.

Material Inventory & Stock Movement

Every material by category, and behind each one the deposits and withdrawals that make up its stock on hand.

Low / No Stock

Every item that is low or out of stock, and the purchase orders that cover it.

Monthly Inventory

Each item’s stock for the month, and — for the job orders still pending — what it stands at before and after their materials are released.

Employee Evaluation

The Log Book & Evaluation — each job’s budget against the time it actually took — and each employee’s logged output from the Output Report.

Line Plan

Master reference per LP — colorways, zipper codes, style allocations, and consumption.

LP Sheets

LP No.Plan nameColorwaysStylesTotal qtyActions

Material Images

Every material's picture in one place, to find a material by sight. Pictures are the same ones Material Inventory shows: adding or changing one here changes it there. Click a material's name to open it on Material Inventory.

Material Image Database

Pattern Images

Import a pattern image once, select it on a Line Plan, and share it with linked Job Orders and Material Summaries. Replacing the image updates linked views. Download images from the library or wherever they are shown.

Pattern Image Database

LP Sheet

Material Summary

Complete the 1-PC prototype materials for each JO, then check and verify them.

Job Orders

JO NO.ITEM NAMELINE PLANPATTERNQTYSTATUS

New Job Order

1 · Line Plan / Pattern

2 · Job Order

Enter the JO number from your register. The system checks for duplicates.

3 · Quantity per color

Total of the colors above.

4 · Deadline, budget and remarks

Saving also creates the job's draft Material Summary, which opens next.

JO

Materials — TTM Material Summary Sheet

The same tracking as the job's Material Summary sheet. Fill it in on the Material Summary page.

Workflow History

Material Summary

System Developer Tools

Company database diagnostics and audit history.

Storage & Server Settings

This application stores shared records on the company MySQL server. Use diagnostics to check the database connection and review recent save activity.

Database Diagnostics & Backup

Backup excludes user accounts and passwords. Diagnostics do not modify production records.

Server Audit Log

The latest 200 entries, newest first: when, who, which part of the system, and the data revision it created. A line marked ⚠ is a fault — a server error, or an error on somebody’s page — with who was signed in when it happened. Who last changed the system, and how many faults are in the log, are said under Diagnostics above. Every entry is kept in the database.